Note to self: when picking up a project that you haven’t worked on in 6 months, read the directions.

Exhibit A: I pulled my husband’s sweater out of the UFO pile this week. I last worked on this in December in hopes of it being ready in time for Christmas. Both fronts, the back, and one sleeve are finished. I would have finished it before the end of 2019 if I hadn’t injured my shoulder by working on it so much (note to self: when knitting a lot, I have to get some exercise to keep from getting injured). I wrote the pattern for this sweater, and I remember knitting the first sleeve, so I jumped right in, figuring I knew what I was doing.

WRONG! I worked six inches past the cuff, merrily increasing every 6th row. When I looked at the directions for how many increases to do, I saw that I was supposed to start out the sleeve by increasing every 4th row.

Riiiiiiiip. It’s amazing how quickly a sweater can be reduced back to yarn. What’s the old saying, the second time is the charm?